"A conservationist is one who is humbly aware that with each stroke of the axe he is writing his signature on the face of the land." - Aldo Leopold
Trail Work
Construction and Maintenance
Armoring
|
Sedona
|
Bridges
|
Walls
|
Tools
|
Jobs
|
Pictures
|
Archives
Things to note from this drawing: 1. Fill turnpike with large angular rocks on the bottom and get smaller as it fills.(water flows through the bottom) 2. Give it a crown because it will settle and so that water drains off the trail.
Related Pictures:
Comments:
Name:
No HTML please. All comments must be approved.
Blog
Pics
Related Posts:
Jarvis Trail Timber Turnpike
Summer Trail Work Update
Trail Work Portfolio
Picture Albums:
Sedona Trails
(16)
Two Penny Bridge
(11)
Broken Arrow Trail - Sedona
(11)
Jacks Canyon Trail
(6)
Middle Fork Trail
(6)
Jarvis Trail
(6)
Continental Divide Trail
(6)
Kane Lake Bridge
(5)
Little Horse Trail
(4)
Trail Drawings
(3)
Trail Workers
(2)
Trail Work Scenic Views and Beauty
(2)
Splitting Rock
(2)
Yellowjacket Trail
(1)